Intralogistics OEMs & integrators · Conveyors · AS/RS · AGV

Material Handling

The controls and networking layer of material-handling systems: conveyor, AS/RS and AGV control design, industrial fieldbus segments and safety functions carried on the control network, engineered for the system integrators and equipment builders whose floor it is.

Challenges

Challenges we solve

  • Multi-vendor interfacing

    Conveyors, sorters, storage and vehicles arrive from different builders with different controllers, so the control structure and the interfaces between them are what you have to engineer.

  • Safety and control on one network

    E-stops, guarding and zone safety have to be provable without running a second network alongside the control one, and that proof has to survive every later change to the floor.

  • Systems that grow after commissioning

    A line gains a spur, a new AGV fleet, another aisle, and the design has to absorb it without a re-engineering cycle or a safety re-validation across the whole floor.

  • Fleet interfaces differ on every project

    One site's fleet manager speaks VDA 5050, the next one has a proprietary API, and the handover logic above them has to behave identically either way.

Capability

What we bring

  • Fieldbus and industrial Ethernet design

    PROFINET, EtherCAT and EtherNet/IP segments engineered to hold their cycle-time budget as nodes and zones are added.

  • Safety networking

    Safety functions carried over the control network, PROFIsafe, openSAFETY and equivalent black-channel approaches under IEC 61508 / ISO 13849, taken through pre-certification testing.

  • Equipment and fleet interfacing

    The interface layer between conveyors, AS/RS controls and AGV fleet managers and the plant's WMS/WCS, over OPC UA or a vendor's own API, so the system reports as one.

  • Custom IO devices, nodes and gateways

    Purpose-built multi-function devices and protocol gateways that replace several off-the-shelf modules, developed from the stack port and board bring-up upward.

  • Training, co-development and support

    Training your engineers on the protocol or safety stack, building the first implementation alongside them, then holding third-line support while your team handles first line.

How does a material handling conveyor control integration engagement work?

We engineer the controls and networking layer of material-handling systems.

This is for the system integrators and equipment builders whose floor it is, and the work is conveyor control integration, AS/RS and AGV control design, and the industrial Ethernet and safety networking underneath them. The layer is a specific one:

  • The network design.
  • The control structure.
  • The device and gateway layer.
  • The safety communication that rides with it.

Installation, site commissioning and the end customer stay with the integrator. Where the design has to be integrated and tested, our team works with your engineers, onshore during integration and test and remotely for the rest.

Intralogistics is an integration discipline more than a machinery one. The conveyor works, the crane works, the vehicles work; the engineering question is whether they hand a load to each other reliably at throughput, and whether the network can prove they did. That question is answered in the design, which is why it is the part that gets outsourced.

What sets the network budget in a material-handling system?

Node count and topology set it, not the fastest device on the floor.

A sorter diverting at speed needs its decision inside a fixed window, and every zone added to the segment eats into it. We design the segments and the traffic split up front so that extending the system later adds nodes without pushing the existing zones out of their cycle budget, which is the difference between a spur being a week’s work and a re-commissioning. A multi-tier conveyor and lift our team built faced exactly this: 18 lanes merging across two levels, held in step on a 2 ms POWERLINK cycle.

A segment's cycle budget drawn as a bar, part occupied by the zones in service and the rest left as headroom, and the two outcomes that follow: with headroom a spur is a configuration change and a budget check, without it the existing zones have to move too.

Whether a spur is a week's work or a re-commissioning is decided in the design.

How is a load handed between fixed equipment and mobile robots?

The handover point is the harder part of an AGV deployment; navigation rarely is.

A vehicle and a fixed conveyor have to agree on state there. We design the interface at the fleet-manager level and model the handover explicitly (requested, granted, occupied, cleared) so the transfer is interlocked instead of being driven by a timer, which is what stops a load being placed onto a station that has not finished releasing the last one. Our work is the interface and the logic above it. Fleet-management software itself is a different business, and the vendors who build it are the people we work alongside. What varies between projects is the interface; the handover model stays the same. Our team has built the vehicle side as well, including the control system for a line-following AGV that reads its route from markers in the floor.

The same handover drawn twice: on the left interlocked on state, with the vehicle requesting, the station granting, the vehicle reporting occupied and the station reporting cleared, each step waiting for the one before it; on the right driven by a timer, which expires while the station is still releasing the previous load, so a second load is placed onto it anyway

A load handover interlocked on state, against one driven by a timer.

Where the fleet manager speaks VDA 5050, the interface is at least a published specification, which makes the handover modelling a bounded piece of work from the start. Note that VDA 5050 remains an industry-association specification and is not yet a European standard, so it is a common agreed interface without a conformance requirement, and plenty of fleet managers do not implement it. Where one does not, the handover is built against that vendor’s own API, usually REST or MQTT, and the state model above it is unchanged. The work that adds is an adapter and its test, without a redesign.

Where does safety communication sit?

On the same wire, in most modern builds.

A safety protocol carries its own integrity checks end to end, so the network beneath it does not have to be trusted and a separate safety network is no longer the default answer. openSAFETY (IEC 61784-3-13) is the clearest example, because it is bus-independent. Our team has ported it onto a customer’s own board and taken it through SIL2 pre-certification testing, and later worked on a fire-safety system where it ran across both POWERLINK and PROFINET segments. That was not intralogistics work, but it is the same discipline a conveyor or AS/RS safety layer needs. Two boundaries apply here:

  • Pre-certification testing is not certification. The assessment belongs to an accredited body.
  • On driverless vehicles the personnel-safety stop is a certified duty under ISO 3691-4 in Europe and ANSI/ITSDF B56.5 in North America, which is a separate question from obstacle detection using ultrasonic, lidar or vision sensors.

One industrial Ethernet segment carrying both control and safety traffic as a black channel, with the safety layer drawn as an envelope running end to end from safety input to safe output, carrying its own sequence numbers, checksums and timeouts, and two roles named beneath: pre-certification of the safety layer, ported and tested, and certification, issued by an accredited body

Safety traffic on the control network, with integrity checked end to end over a black channel.

Does floor-level tracking change any of this?

It is starting to change what the fleet layer knows, but not what the safety layer may conclude.

Wireless location tracking over 5G and Wi-Fi is being demonstrated for floor-level material handling. The interlock at the handover point still has to be provable on its own terms. We treat a location feed as useful context for traffic management and not as a substitute for the interlock.

How do you design for a system that keeps growing?

We keep the control structure per zone, identical and parameterised.

Material-handling systems are commissioned in phases and then extended for years.

  • What an extension represents. Adding an aisle or a spur is a configuration and a network-budget check, with no new one-off logic, and the safety validation stays limited to the zone that changed instead of covering the whole floor.
  • When it is accounted for. At the design step, while the first phase is still on paper, and not after the extension is needed during operation.

The same reasoning drove an EtherCAT motion platform our team built to be configured into several machine geometries instead of rebuilding per machine.

FAQ

Frequently asked questions

Do you install and commission material-handling systems on site?
No. We engineer the control, network and safety layer and prove it with your team; the floor installation, the site commissioning and the end customer stay with the integrator or builder. Where a design has to be integrated and tested we work alongside your engineers, onshore during integration and test and remotely for the rest.
Can equipment from different builders run under one control scheme?
Yes. The usual approach is protocol bridging at the controller instead of standardising the floor, so each supplier's equipment keeps its native interface while the sequence above it is coherent.
Does safety need its own separate network?
No. Safety telegrams ride the standard industrial Ethernet as a black channel, because the safety layer proves integrity end to end, so one physical network carries both control and safety traffic.
Do you certify the safety functions you engineer?
No. Certification is an accredited body's judgement, never a supplier's. What we do is design the safety communication layer and take it through pre-certification testing, so what reaches the assessment has already been exercised before the assessment sees it.
How do AGV fleets fit into a fixed conveyor system?
Through the fleet manager, not vehicle by vehicle, which makes it another participant in the plant data layer, so handover points between fixed equipment and vehicles are sequenced, not just timed.
What if the fleet manager does not support VDA 5050?
Then the handover is built against that vendor's own interface, usually a REST or MQTT API, and the state model above it stays the same. VDA 5050 shortens the specification work; it is not a precondition, and a proprietary fleet interface is still a bounded piece of engineering once the handover states are agreed.
References
  • IEC 61158 / IEC 61784 — industrial fieldbus and industrial Ethernet standards
  • IEC 61508 / ISO 13849 — functional safety for machinery control systems
  • IEC 61784-3-13 (openSAFETY) — bus-independent safety communication profile
  • ISO 3691-4 and ANSI/ITSDF B56.5 — driverless industrial truck safety
  • VDA 5050 — the AGV/AMR fleet-interface specification, carried over MQTT
  • OPC UA (IEC 62541) — equipment data to WCS/WMS layers
  • ISA-95 / IEC 62264 — enterprise-control system integration