Automotive

The plant-floor network, test-system and embedded layer beneath an automotive production line: deterministic networking, end-of-line testers and traceability paths, engineered for the MES vendors, line integrators and manufacturing engineering groups who deliver into vehicle plants.

Challenges

Challenges we solve

  • Mixed-generation plant networks

    PROFINET, EtherNet/IP, EtherCAT on cells and legacy fieldbus on the same floor, where new lines must exchange data with installed equipment without re-cabling.

  • End-of-line test throughput

    EOL testers become the bottleneck as variants multiply. Test systems need to keep cycle time while coverage grows.

  • Traceability mandates

    Per-part genealogy from press shop to dispatch, with data capture at every station, without slowing the line.

  • Safety that has to hold as cells change

    Robot cells, guarding and e-stops are re-arranged more often than the network under them, and the safety communication has to stay provable through each change.

Capability

What we bring

  • Deterministic line networking

    TSN and industrial Ethernet design for robot cells, conveyors, and vision stations with hard cycle-time budgets.

  • Test system engineering

    EOL and in-process testers, covering embedded firmware, fixture control, and results pipelines into MES.

  • Brownfield gateway and bridge design

    Protocol gateways and bridges designed to connect installed PLCs and drives to modern plant IT without a forklift upgrade, built for the integrator to deploy.

  • Safety communication design

    Safety functions carried on the control network as a black channel under IEC 61508 and ISO 13849, taken through pre-certification testing — the certification itself belongs to an accredited body, never to us.

  • The device and protocol layer beneath an MES

    For MES vendors, the PLC, I/O, gateway and legacy-network integration that merges floor data streams into the platform they are delivering.

  • Training, co-development and support

    Training your engineers on the protocol or platform, building the first implementation alongside them, then holding third-line support while your team handles first line.

How does an automotive plant-floor network integration engagement work?

We engineer the deterministic networks, test systems and protocol bridges under an automotive production line.

This is for vehicle OEMs, their tier suppliers, and the MES vendors and line integrators delivering into those plants. You keep the line, the plant relationship and the production schedule; we take the parts that need a standing specialism:

  • deterministic segments for robot cells, conveyors and vision stations over PROFINET (IEC 61158) and IEEE 802.1 TSN, engineered to a cycle-time budget
  • gateways and protocol bridges between new cells and an installed base of PLCs, drives and legacy fieldbus
  • end-of-line and in-process testers, covering firmware, fixture control and the results pipeline into MES
  • the station-level capture path that carries per-part genealogy upward over OPC UA
  • safety communication on the control network, taken through pre-certification testing
  • training your engineers on the technology, building the first implementation with them, then third-line support behind their first line

We do not commission lines on the plant floor. That belongs to the integrator or the plant’s own engineering group. Where the work has to be integrated and tested, our team works with your engineers, onshore during integration and test and remotely for the rest. The engagement page sets out the modes and how they are priced.

A production line in four bands, each naming who holds the customer relationship: the MES vendor's platform at the top, the network, test and bridge layer beneath it carrying deterministic segments, gateways and bridges, testers, the capture path and safety communication, then the integrator's installation and commissioning, and the plant's own line and schedule at the bottom

Four layers of a production line, and who holds the customer relationship at each.

A vehicle plant is never greenfield: mixed-generation networks, rising variant counts and traceability mandates all land on the same floor at once. The layer we build is what lets capability be added to that floor incrementally, so production keeps running while it changes. This page covers the plant. The electronics inside the vehicle, meaning CAN, LIN, Automotive Ethernet, diagnostics and the ECU software around them, are a different discipline and have their own page on automotive electronics.

Who do you usually engage with on a plant programme?

Often a platform vendor instead of the plant itself.

An MES supplier winning a line needs the layer beneath their product built and proven: PLCs, I/O devices and gateways spanning legacy and current networks, with the floor data streams merged and presented in a form their platform can consume. That is the part we build. Digesting the data is their product, and the customer relationship stays with them. The same applies to line integrators and to tier suppliers’ manufacturing engineering groups. We are the engineering bench behind the delivery, not a competing bidder for it. That also decides how the work is staffed: our engineers sit with yours during integration and test, and the people on the plant floor are still your people.

How do new lines exchange data with installed plant equipment?

Most plants run several protocol generations side by side, and that usually needs a bridge, not a migration.

PROFINET on European floors, EtherNet/IP on North American ones, EtherCAT where a cell needs tight coordinated motion, and legacy fieldbus on installed machinery that is not moving. Instead of a forklift upgrade of the floor, we design protocol gateways and bridges that let new deterministic lines exchange data with existing PLCs and drives, and engineer the TSN and industrial-Ethernet segments to hold their cycle-time budget as cells are added. What we hand over is a device and a design; putting it on the floor is the integrator’s step.

A new deterministic line above, PROFINET floors, EtherNet/IP floors and legacy fieldbus below, and between them the gateways, bridges and TSN segments that let them exchange data while the cycle budget holds.

Gateways, bridges and TSN segments between a new line and the installed plant.

How do you hold end-of-line test throughput as variants multiply?

We engineer the tester firmware, fixture control and results pipeline so coverage grows without stretching cycle time.

EOL testers turn into the bottleneck when every vehicle is a variant. Three things keep the cycle time flat:

  • Parameterised test sequences per variant.
  • Deterministic fixture I/O.
  • Pass/fail and measurement data streamed straight into MES.

How is per-part traceability captured without slowing the line?

We instrument stations to publish part-level data over OPC UA (IEC 62541) into an ISA-95 MES layer.

The genealogy in question is per-part build genealogy: which components, which process settings and which test results went into each individual part, and into the vehicle it ended up in. It is what a targeted recall runs on, which is why the traceability expectations in the automotive quality standards reach every station from press shop to dispatch, well beyond final assembly. Each part therefore carries a complete build record, captured in the background of the normal station cycle, not as an added test step.

One part followed across five stations from press shop to dispatch, each adding a cell to the build record beneath it (coil lot and press settings, weld results and fixture identity, paint batch and oven profile, component identities and torque results, then final test and the assigned VIN), with a recall query running backwards along the same chain

A part's build record, assembled station by station and read backwards by a recall query.

How do you keep the traceability path from disturbing the cells?

We separate them in the network design.

A station publishing per-part genealogy sits on the same infrastructure as the cell’s motion traffic, and the two have nothing in common except the wire. The design question is whether the traceability path can be added, extended and occasionally broken without any of that reaching the cell.

  • How it is done. The segmentation has to be settled before the data question, and IEC 62443 is the standard that defines how: zones with a declared conduit between them, in place of a flat floor where an MES query and a drive setpoint traverse the same path.
  • Why it pays off. It is what makes the traceability layer safe to change, and that matters because traceability requirements change far more often than robot cells do.
  • What it is not. This is segmentation of the plant network, a different subject from the zonal E/E architecture inside the vehicle, covered on the automotive electronics page.

Two versions of one plant floor: on the left a flat network where the MES, station PC, robot cell and drive share a single path, so a query and a setpoint traverse the same wire; on the right the same equipment in two IEC 62443 zones, a traceability zone where queries run between the MES and the station PC and a new station has been added, and a control zone where setpoints run between the robot cell and the drive, joined by one declared conduit that part data crosses one way

Two zones and one conduit, so the traceability path can change without the cell noticing.

Where does safety communication sit on a line?

On the control network, in most modern builds.

A safety protocol carries its own integrity checks end to end, so the network beneath it does not have to be trusted and a second physical network is no longer the default answer. Robot cells make this a design task, rather than inheriting: guarding, interlocks and e-stops are re-arranged whenever a cell is re-tooled, and the safety communication has to stay provable across each change. Our part is the communication layer and the pre-certification testing that exercises it. Our team has ported a bus-independent safety profile onto a customer’s own board and taken it through SIL2 pre-certification. The certificate itself is an accredited body’s to issue, and the safety case for an installed line stays with whoever owns that installation.

FAQ

Frequently asked questions

Do you commission production lines on the plant floor?
No. We engineer the network, device and test layer and prove it with your team; installation and site commissioning belong to the integrator or the plant's own engineering group. Our team works onshore during integration and test and remotely for the rest of a programme.
We need new robot cells to exchange data with an installed PLC base. What can you support us with?
The device and protocol part. We design and build the gateways and bridges between PROFINET, EtherNet/IP, EtherCAT and legacy fieldbus, and engineer the segments so the new line holds its cycle-time budget against installed equipment. Cell installation, floor wiring and the production changeover are the integrator's, and we work behind them while it happens.
We supply the MES. What part of this do you do, and what stays with us?
We build the layer underneath, meaning the PLC, I/O device and gateway integration across legacy and new networks, merging the floor data streams and presenting them to your platform. Digesting that data is your product, and the customer relationship stays with your team. We work as your engineering partner, not as a second integrator in front of your customer.
Do you build the end-of-line testers or only the networking?
Both. We deliver EOL and in-process tester firmware, fixture control and the results pipeline into MES, alongside the line network they run on.
How does per-part traceability reach our MES/ERP?
Station-level capture is published over OPC UA (IEC 62541) to an ISA-95 MES layer, giving genealogy from press shop to dispatch without adding station cycle time.
Do you certify the safety functions on a line?
No. We design the safety communication layer and take it through pre-certification testing so it is exercised before it is assessed; the certificate is issued by an accredited body, and the safety case for the installed line stays with whoever owns that installation.
References
  • IEC 61158 / IEC 61784 — industrial communication network standards (PROFINET)
  • IEEE 802.1 TSN — time-sensitive networking for converged plant networks
  • IEC/IEEE 60802:2026 — the TSN profile for industrial automation, which fixes the option set a plant network can require of its equipment
  • IEC 61508 / ISO 13849 — functional safety for machinery control systems
  • ISO 10218 — safety requirements for industrial robots and robot systems
  • OPC UA (IEC 62541) — MES / OT data integration
  • ISA-95 / IEC 62264 — enterprise-control (MES) system integration
  • IEC 62443 — network segmentation for plant networks that reach plant IT
Go deeper

Building for this industry?

Start with our engineering notes, or talk directly to the team that will build it.