Farm machinery OEMs · Tractors & implements · Grading, sorting & dairy

Agritech Machinery

Connectivity and control engineering inside agricultural machinery, for the OEMs whose machines they are: the machine-end data path to a remote-service platform, control retrofits off obsolete or closed platforms, and the CAN-based interfaces underneath both.

Challenges

Challenges we solve

  • Controllers you cannot get anymore

    The machine is still selling; the controller inside it reached end of life two supplier generations ago, and the toolchain went with it.

  • Machines that go quiet once sold

    Equipment works a season away from any network. Without telemetry the builder learns about a failure from a phone call, not from the machine.

  • Compliance arriving on a fixed date

    CE marking already applies; the EU Cyber Resilience Act adds security obligations to connected machinery on a deadline that does not move.

Capability

What we bring

  • Remote service and diagnostics

    The machine-end connector that gets a working machine's data out to a remote-service platform, so a fault is investigated from a desk, without a site visit.

  • Control retrofit and migration

    Moving machine control off closed or obsolete platforms onto open controllers and Linux/embedded targets the OEM can keep maintaining.

  • Machine telemetry and IIoT

    Edge data capture, store-and-forward over intermittent links, and a fleet view the builder can turn into a service offering.

  • Field-network and interface work

    CAN-based machine and implement interfaces (ISO 11783 ISOBUS and SAE J1939) bridged to the modern control and data layer.

  • Custom control nodes and gateways

    Purpose-built control nodes and telemetry gateways developed from board bring-up and stack port upward for a machine in a field rather than bent out of a reference design.

  • Training, co-development and support

    Training your engineers on the platform, protocol or telemetry stack, building the first implementation alongside them, then holding third-line support while your team handles first line.

How does an agricultural machinery control retrofit engagement work?

We do the control and connectivity engineering inside agricultural machinery.

This is for the OEMs whose machines they are. You keep the machine, the brand and the dealer network; we take the parts that need a standing specialism:

  • the machine-end connector that carries a working machine’s data to a remote-service platform
  • control retrofits that move a machine off an obsolete or closed platform onto one the OEM can keep maintaining
  • telemetry that survives an intermittent link, and the fleet view a builder can turn into a service offering
  • CAN-based machine and implement interfaces, ISO 11783 ISOBUS and SAE J1939, bridged to the modern control and data layer
  • purpose-built control nodes and telemetry gateways, developed from board bring-up and stack port upward
  • training your engineers on the platform, building the first implementation with them, then third-line support behind their first line

We do not build machines and we do not sell a telemetry product. Where a design has to be integrated and tested, our team works with your engineers, onshore during integration and test and remotely for the rest. The engagement page sets out the modes and how they are priced.

Why does a controller replacement pull telemetry and compliance with it?

Obsolescence, telemetry and compliance share one root: a machine that outlives the electronics inside it.

Builders in this sector rarely have a control problem specific to agriculture. They have a controller that went end of life two supplier generations ago, a machine that disappears the moment it leaves the yard, and a compliance date approaching. The answer to all three is the same, a control platform the OEM can still open in five years, which is why they are cheaper to answer at once than one at a time. That is why a retrofit and a telemetry project usually want to be the same project. The moment the control platform is being touched is the cheapest moment to add the data path and the secure update mechanism the Cyber Resilience Act will ask for, and the most expensive version of both is the one retrofitted onto a fleet that has already shipped.

Which slices of the work can you support?

Any part that is going obsolete or is yet to go live: the controller, the data path, the bus interface.

  • An end-of-life controller. A machine still selling on a part that cannot be bought, assessed before anything is redesigned.
  • Reporting from the field. The machine-end data path to a remote-service or fleet platform, designed around an intermittent link.
  • An implement interface. J1939 or ISOBUS node-level work, bridged to whatever the control and data layer above it has become.
  • A closed platform migration. Control moved onto an open controller and toolchain, or the proprietary part isolated behind an interface so it can be replaced later.
  • A device to build. A purpose-built control node or telemetry gateway, built from board bring-up upward.
  • Team bring-up. Your own engineers brought up to speed. Training, then building the first implementation alongside your team, with third-line support behind them.

How does a working machine reach a remote-service platform?

A connector in the machine speaks to both ends, the machine bus and the remote platform.

The typical shape is a platform vendor assembling remote connection, remote debugging, fault resolution and remote operation for complex machines, which is then sold to the OEMs who build them. The machine’s control data is exposed over OPC UA; the platform ingests over MQTT; and the join between the two is the part that has to be engineered. Our team built exactly that piece. At the time nothing joined the two sides: no companion specification, no reference implementation, and standards on both sides written for a plant floor with a fixed network rather than for a machine on an intermittent cellular link.

A machine controller in the field exposes control data over OPC UA; the connector republishes it over MQTT across an intermittent cellular link to a broker and on into a remote-service platform

Where the connector sits between a machine's OPC UA address space and a remote-service platform's MQTT ingest.

What would the CAN and ISOBUS side involve?

The job is getting a protocol running correctly on a specific device, as a node on a third-party network.

That is the whole job:

  • The stack has to fit the part.
  • The timing has to hold under real bus load.
  • The device has to behave on a busy network as well as on the bench.

ISOBUS (ISO 11783) is built on SAE J1939, so a J1939 node is the same work with a different application layer above it. As an example, our team has delivered CAN bus integration on farm and load-vehicle electronics, and SAE-level control integration on marine systems. The node-level discipline transfers across any of these networks; what changes is the application layer above it. Where a programme needs ISOBUS certification or Task Controller job data, the boundaries should be set early. Both are answered in the FAQ below.

ISOBUS (ISO 11783) and SAE J1939 as the application layer the market chooses, one unchanged node-level job underneath (the stack fits the part, the timing holds under real bus load, the device behaves on a busy bus), and the CAN bus underneath both.

ISOBUS builds on J1939; the node-level work underneath is the same for both.

How do you design telemetry around intermittent coverage?

We design around the gaps, so a machine out of coverage still produces a complete record.

Coverage is intermittent, power is the machine’s own, and the environment is dust, vibration and temperature swing, so buffering becomes the design centre: the edge device records the machine’s data continuously and reconciles when a link appears, rather than sampling only while connected. Anything that assumes a live connection produces a fleet view with holes in it exactly where the interesting failures happened.

One machine's day with the two spans that have no network coverage shaded, and a machine-state band showing the machine running, failing inside the first of them, then running again; the sample-while-connected trace loses both spans, while the record-and-reconcile trace covers the whole day because the edge device buffers through each gap and fills it in when the link returns

Both methods compared: sampling while connected vs recording and reconciling, over one machine's day with coverage gaps.

What is your approach to choosing a serviceable control platform?

We move control onto platforms with a documented supply horizon and an open toolchain.

The target matters more than the retrofit, so that is where we spend the assessment. It means the next revision is an engineering task the OEM can schedule, not a search for a discontinued part. Where a proprietary controller has to stay for now, we isolate it behind an interface so replacing it later is a contained change instead of a second migration.

What does connecting a machine add to the compliance picture?

A machine that carries data off itself becomes a product with digital elements, so the CRA applies.

That pulls the EU Cyber Resilience Act’s obligations onto it alongside existing CE marking:

  • Secure update paths.
  • Vulnerability handling.
  • A documented software bill of materials.

We build that in at the platform level while the control work is happening, because retrofitting a secure update mechanism onto a shipped fleet costs considerably more.

What does the Cyber Resilience Act mean for a machine builder?

It sets two fixed dates, and the decisions that meet them are taken years earlier.

Regulation (EU) 2024/2847 has applied vulnerability and incident reporting duties since 11 September 2026, with full enforcement on 11 December 2027, and it covers products with digital elements sold into the EU. For agricultural machinery that increasingly means the telemetry unit and the controller, not just the cab display, and the secure-update, SBOM and vulnerability-handling design behind them.

Two tracks over one time axis: a machine programme running from platform decisions through development, production and service life, against the two fixed dates of Regulation (EU) 2024/2847 (reporting duties from 11 September 2026 and full enforcement from 11 December 2027), with the platform decisions that determine compliance falling years before either date

A machine programme against the two CRA dates in Regulation (EU) 2024/2847.

The practical requirements land in engineering decisions made years earlier: whether the machine can take a secure update in the field, whether anyone knows which software components are inside it, and whether its firmware can still be rebuilt when a vulnerability report arrives. An open, serviceable platform makes that answerable. A closed controller from a supplier who no longer sells or supports that product generally does not.

FAQ

Frequently asked questions

Who builds the control and telemetry layer in an agricultural machine?
The OEM specifies it and we build it, which is how most of this work is done. We are not a machine builder and we do not sell a telemetry product. What we deliver is the control and connectivity layer inside our customer's machine. The OEM keeps the machine, the brand and the dealer relationship. Where a design has to be integrated and tested, our team works with your engineers offshore.
Our machines are built around ISOBUS and J1939. Do you work at that level?
Yes. Those are CAN-based interfaces, and our work is the control and telemetry layer around them, meaning the controller, the embedded platform and the gateway that carries machine data off the vehicle.
Can telemetry be added to machines already sold and in the field?
Yes. A retrofit gateway reads the existing machine network and buffers data locally, so a machine working out of coverage still delivers a complete record once it reconnects.
Which parts of this have you delivered in agriculture itself?
The machine-end connectivity. Our team built the machine-end connector for a remote service, debugging and operation platform aimed at agricultural machinery OEMs, taking control data off the machine over OPC UA and into the platform over MQTT. The CAN and marine control work named on this page comes from adjacent sectors, and we mark it that way on purpose.
Can you take a device through AEF conformance?
No. AEF conformance is the ISOBUS certification scheme and it is run by the AEF, not by a supplier. What we do is the engineering that has to be right before an assessment is worth booking, meaning the node-level protocol work, the interface behaviour and the testing that exercises it. It is the same way we handle pre-compliance on industrial protocols.
Can you take on ISOBUS Task Controller work?
Yes. The node-level J1939 and ISOBUS interface work underneath it is delivered ground. For ISO 11783-10 and its ISOXML job data, we work from the specification, and we set out what that means for the plan when we first talk it through.
References
  • ISO 11783 (ISOBUS) — tractor and implement serial control and communications
  • SAE J1939 — the CAN-based heavy-duty vehicle network ISOBUS is built on
  • IEC 61508 / ISO 13849 — functional safety for machinery control
  • ISO 25119 — the agricultural and forestry derivative, defining AgPL
  • AEF conformance — the ISOBUS certification scheme, run by the AEF, not by us
  • EU Cyber Resilience Act — security requirements for products with digital elements
Go deeper

Building for this industry?

Start with our engineering notes, or talk directly to the team that will build it.