Automated Test & Measurement Systems
Automated test equipment development. End-of-line functional test systems, jigs and fixtures, and the sequencing and measurement software that turns a bench setup into a repeatable station.
Who this is for
-
Tier suppliers
A test station built for a part entering production, that covers the fixture, the interface, the sequencing and the result output.
-
Device manufacturers
Prove every unit before it ships, at line rate, without a technician interpreting the result.
-
Engineering providers
Add test-system capacity to a programme where the product team is already fully committed.
What we do
- 01
End-of-line test systems
End-of-line functional test system development, i.e. the station that decides whether a unit ships.
- 02
Jigs and fixtures
Test jig and fixture development, including the mechanical and electrical interface that has to survive thousands of insertions.
- 03
DUT interface design
Device under test interface design, where contact, protection and repeatability decide the validity of the measurement.
- 04
Test sequencing software
Test sequencing and measurement software that runs the plan, records the result, and brings the station to a defined, recorded state when something in the test setup fails.
- 05
Measurement integration
Instruments, power supplies and loads brought under one sequencer instead of separate scripts per bench.
- 06
Traceability output
Per-unit results emitted in a form the plant's systems can consume, instead of a machine log dump.
Technology verticals
- Test methods
- Functional test · end-of-line verification · communication interface test · parametric measurement · burn-in and soak sequencing
- Interfaces
- Instrument control · industrial fieldbus and Ethernet targets · database and MES result output
- What you receive
- Test station hardware and fixture where they are ours · DUT interface design · sequencing and measurement application + build environment · calibration and repeatability record · per-unit result output specification
What does automated test equipment development cover?
Automated test equipment development covers four parts: the fixture, the interface to the unit, the sequencer and the output.
Each is designed and verified separately because each can fail on its own. A fixture that holds the unit and makes contact. An interface that decides whether that contact yields a valid measurement. A sequencer that runs the plan and decides pass or fail. And the output, which determines whether the result is usable downstream. The engagement is usually one of these shapes:
- A complete end-of-line station. End-of-line functional test system development for a part entering production, hardware and software.
- The fixture on its own. Test jig and fixture development where the test plan exists and the mechanics do not.
- The DUT interface. Device under test interface design, where contact, protection and repeatability are the engineering.
- The software over your instruments. Test sequencing and measurement software, so a bench of scripts becomes one station with one result format.
- An inherited station. Taking over something already in production and establishing what it measures today.
Contact repeatability is the most common source of trouble in production. A station that measures reliably on a bench and drifts on a line has usually not lost its instruments; the contact has changed, and the software has no way to detect it unless it was designed to.
How is fixture wear handled during design?
We treat contact quality as a measured quantity, so wear shows up as measurable drift before it causes false rejects.
A fixture makes contact thousands of times, and the resistance of that contact drifts well before it fails outright. A station with no allowance for this reports a gradual increase in marginal units, which then gets investigated as a manufacturing problem. The design answer is a known-good reference the station checks itself against, plus thresholds that separate a failing unit from a failing fixture, both specified as part of the test plan. The insertion count also sets the contact plating, hard gold over nickel for low-level signals, and whether contacts are field-replaceable.
How do you configure sequencing software to handle failures?
The sequencer is configured to define what happens outside the happy path, and hands back a consumable result.
- Fault handling. Running a passing sequence is straightforward. A production station also has to handle a unit that does not respond, an instrument returning nonsense, a fixture that is half-closed, and an operator intervening mid-sequence. Each of those ends in a defined, recorded state rather than an exception.
- The output. A per-unit result that reaches the plant’s systems in a form they already consume gets used, while an incompatible log file does not integrate well. This is usually done via live data collection similar to OPC UA or northbound integration.
Which domains do you cover under test services, and how do they align?
Test systems borders embedded systems and protocol conformance work, and stops short of supervisory control.
| Test target | Where it is scoped | Why |
|---|---|---|
| The device or unit being tested | embedded systems | It is frequently a device of that kind, which is useful when deciding what to measure and where the failures are likely to be |
| The communication interface | real-time Ethernet · fieldbus | The test plan draws on the conformance pre-testing we do there |
| Supervisory control | control software | It is not part of automated test systems because the buyers share almost no vocabulary and no procurement path |
We build and hand over the station and the interface along with the test system. Installation and commissioning on a production floor stays with the existing contractor team, and our engineers work alongside yours through integration and acceptance.
Frequently asked questions
Who does automated test equipment development?
What do you cover as part of the ongoing test-jig service?
Do you provide automated test systems as part of DCS or SCADA control software?
Do you calibrate or certify the test station?
Can you take over an existing test system?
Do you install the station on the production line?
What does an end-of-line test station cost, and what is the lead time?
What framework do you use to run the sequencing software?
What contact materials do you use for high-insertion-count fixtures?
How do you plan support for regulatory traceability in the per-unit result?
What cycle time or throughput do your automotive test jigs achieve?
How do you establish test coverage and build a fault-injection matrix?
How do you catch a test station drifting after it has been running for years?
- IEC 61010-1 — safety requirements for electrical equipment for measurement, control and laboratory use
- ISO/IEC 17025 — the competence requirement that sits behind an accredited calibration, and the reason calibration is not ours to perform
- IEC 61000-4 series — electromagnetic immunity testing, which a measurement station is designed to operate within
- IPC-9252 — requirements for electrical testing of unpopulated printed boards
- JEDEC JESD22-A104 — temperature cycling, used in burn-in and soak sequencing
Ready to scope this for your product?
Start with our engineering notes, or talk directly to the team that will build it.